
|
STEP ONE: Prepare the levelling pad and install the base course.
|
| Determine wall location. Dig a shallow trench for wall base (see cross section). Place granular leveling pad material. Compact and level the base pad. Place and level the first course units. If grade changes along base of wall, create stepped leveling pad as required.Always start wall at lowest elevation,working to highest. Complete base course before proceeding with additional courses. |
